Group Engineers Malaysia Sdn Bhd
REPLACEMENT OF GAS PIPELINE NO. 1, KIDURONG POWER STATION
MAIN SCOPE: COMPLETE C&S AND M&E WORKS
3KM x 12†gas pipeline material grade Seamless API5L PSL2 X52 – Design Pressure at 94 Bar, Pig Launching and Receiving Station complete with Emergency Shut Off Valves, Pipe Bridge, SCADA and Instrumentation.
ClientSarawak Energy Berhad |
LocationBintulu, Sarawak |
Commencement Date2017Completion Date2018 |
IndustryIndustrial Process & Cooling System |
||
Our ServiceEngineering, Procurement, Construction and Commissioning (EPCC) |
||
